Top Story
To right: Areas of Desolation Canyon located along the Green River have been opened for oil drilling.
Below: Crypto-biotic soil in Southern Utah can be easily destroyed with a tire track or footprint. Cyrpto-biotic soil takes 10,000 years to fully develop.
Photo of the Day
Photo of the Day

